
UL/cUL/Dlc 2FT/3FT/4FT/5FT/6FT/8FT
8W/9W/10W/12W/14W/15W/16W/18W/20W/22W/24W/36W/40W sensor T8 LED
Tube
Product Advantages
Ul Cul Dlc4.2 Universal Compatible Led T8 Tube.
It Can Be Installed It in Traditional Fixture Directly, Saving
Labour Cost.
The Universal Compatible Tube Could Be Compatible With Ballast,
Power One End and Power Tow End at The Same Time.
130lm/W, Could Apply for Government Rebate.
Easy Installation.
Technical Specifications
Name | The universal compatible tube |
Rated Power | 8W 12W 16W 20W 22W 27W 36W 40W |
Input Voltage | AC100~277V |
Operating frequency | 50/60 Hz |
Equivalent traditional lamp power | 40W |
High power factor | ≥0.9 |
Color rendering index (CRI) | Ra>80 |
THD | <20% |
Beam angle | 120 ° |
LED Type | SMD2835 with LM80 report |
High efficiency | up to 130 lm/W |
Color temperature (CCT) | 3000k, 4000K, 5000K, 6000K |
Light color | Warm White, Natural White, White, Cool White |
Size | 2ft 4ft 5ft 6ft 8ft |
Base | G13 Fa8 R17D |
Cover | Frosted & Clear |
End cap | Fixed |
Material | Aluminum +PC |
Structure | 1/2Aluminum, 1/2 PC cover |
Connection | Power 1 end or Power 2 end or compatible ballast |
Certificates | UL, cUL, DLC4.2, TUV, GS, CB, SAA, FCC, CE, RoHS, UL No.: E491981, E484482 |
Warranty | 5 years |
Product Description
Universal Compatibility:
UL cUL DLC Type A + Type B, compatible with electronic ballast,
directly replace traditional fluorescent lamps.
Dual model: Plug and play T8 LED tube (Type A) , Bypass T8 LED tube
(Type B)
Also It work directly from 100-277VAC, connect to electricity
directly.
The universal compatible tube could be compatible with ballast,
power one end and power tow end at the same time. it can be
installed it in traditional fixture directly, saving labour cost.
Our LED tube could be compatible with different ballast, we sorted
out ballast brand, which already tested!
Marks:
Compatible tube---it's universal compatible P1, P2 and ballast at
the same time.
P1---Power one end without ballast.
P2---Power two ends with ballast or without ballast.
Installation Steps
Application
1. Offices, meeting room
2. Shopping malls. supermarkets
3. Library, school
4. Exhibition Gallery
5. Factories, airport
6. Closet, hotel
7. Recreation application, railway station, car park
User Manual:
Switch off power of the mains supply or respectively of the
connection lead before doing any works.
The complete installation must be done by an electrical expert who
is familiar with the valid directives.
Quaity Control:
Stability TEST: make sure 100% of the lamps be aging test at least
48hours
Lighting TEST: make sure 100% of the lamps be lighted before
packing
Drop TEST: make sure every single light have been well protected by
box
Contact:
Peony Jin
Mobile: 0086-180 0253 2737
Please feel free to send us your inquiry, We are at your service
any time!
Shenzhen ATA Technology Co., Ltd
Before we run a factory, we have international marketing experience for six years. Our products have been exporting all over the world. The earliest market is Japan, UK, USA, Germany, Netherlands, Spain, Switzerland. We have been doing a lots of projects in East America, Middle America, West America, North America. Europe Spain, France, Switzerland, Netherlands. Asia such as Japan, Taiwan. Middle East Dubai. China, such as Central China, South China, North China, Northwest China, Northeast China, Southwest China.
Integrity, Quality, and Service are placed at the first place which helped us win a large market. We are convinced that only be sincerity can make cooperations long-term. Come on, contact us, You can get the most benefits from our reliable management system, stable quality, competitive prices, perfect services and professional advice here. We are sure we will have a good cooperation relationship and make a brilliant future for both of parities!